首站-论文投稿智能助手
典型文献
Start-Ups Seek to Accelerate Path to Nuclear Fusion
文献摘要:
In September 2021,the world's most powerful high-tempera-ture superconducting magnet passed its first test,generating a 20 T magnetic field during a 5 h trial[1].The 3 m tall,9000 kg device(Fig.1)is the centerpiece of an ambitious plan by the start-up Commonwealth Fusion Systems,headquartered in Cambridge,MA,USA,to build a fusion reactor that produces more energy than it requires to stimulate and sustain its nuclear reactions[2,3].None of the experimental fusion approaches that scientists have tested has come close to that mark.Even the multi-billion USD International Thermonuclear Experimental Reactor(ITER),the massive project sponsored by 35 countries that is under construction in southern France(Fig.2),is not projected to pass the breakeven point until the mid-2030s at the earliest[2,4].But Commonwealth Fusion Systems aims to have a pilot plant operating by 2025.
文献关键词:
作者姓名:
Mitch Leslie
作者机构:
文献出处:
引用格式:
[1]Mitch Leslie-.Start-Ups Seek to Accelerate Path to Nuclear Fusion)[J].工程(英文),2022(01):6-8
A类:
Ups,Seek,centerpiece,breakeven
B类:
Start,Accelerate,Path,Nuclear,Fusion,September,world,most,powerful,high,tempera,ture,superconducting,passed,its,first,generating,magnetic,field,during,trial,tall,device,Fig,ambitious,by,start,Commonwealth,Systems,headquartered,Cambridge,MA,USA,build,fusion,reactor,that,produces,more,energy,than,requires,stimulate,sustain,reactions,None,experimental,approaches,scientists,have,tested,has,come,close,mark,Even,multi,billion,USD,International,Thermonuclear,Experimental,Reactor,ITER,massive,sponsored,countries,under,construction,southern,France,not,projected,point,until,mid,2030s,earliest,But,aims,pilot,plant,operating
AB值:
0.682668
相似文献
机标中图分类号,由域田数据科技根据网络公开资料自动分析生成,仅供学习研究参考。