Use of float consumption rate in resource leveling of construction projects
文献摘要:
The management of resources has been claimed to be as important as scheduling methods.Inefficiency in managing resources may bring about severe delays and cost overruns caused by resource shortages in some cases and/or idle resources in others.Therefore,resources should be utilized efficiently to prevent project failures.Resource leveling is one of the approaches that are used for the management of resources.It aims to minimize fluctuations,peaks,and valleys in resource utilization without changing the completion time of a project and the number of resources required.Although the main principle behind traditional resource leveling is achieving an even flow of resources while the original project duration remains unchanged,the literature supports the need to develop an efficient model that discriminates among the activities that are selected for participation in resource leveling.For this purpose,this study has developed a model that considers the float consumption rates of activities in resource leveling.The float consumption rate is the percentage that is set to determine the maximum amount of float which will be consumed to shift the start time of the activity.The proposed model allows a scheduler to assign float consumption rates to each activity that can be used during the resource leveling procedure.When the required information is inputted,the proposed model automatically changes the required daily resources as it shifts the noncritical activities along their available total float times.The proposed model is expected to minimize the likelihood of severe delays and cost overruns.The model is demonstrated by constructing a network and its resource utilization histograms.
文献关键词:
中图分类号:
作者姓名:
Atilla DAMCI;Gul POLAT;Firat Dogu AKIN;Harun TURKOGLU
作者机构:
Department of Civil Engineering,Istanbul Technical University,Istanbul 34469,Turkey
文献出处:
引用格式:
[1]Atilla DAMCI;Gul POLAT;Firat Dogu AKIN;Harun TURKOGLU-.Use of float consumption rate in resource leveling of construction projects)[J].工程管理前沿(英文版),2022(01):135-147
A类:
Inefficiency,overruns,discriminates,noncritical
B类:
Use,float,consumption,leveling,construction,projects,management,resources,has,been,claimed,important,scheduling,methods,managing,may,bring,about,severe,delays,cost,caused,by,shortages,some,cases,idle,others,Therefore,should,utilized,efficiently,prevent,failures,Resource,one,approaches,that,are,It,aims,minimize,fluctuations,peaks,valleys,utilization,without,changing,completion,number,required,Although,principle,behind,traditional,achieving,flow,while,original,duration,remains,unchanged,literature,supports,need,model,among,activities,selected,participation,For,this,purpose,study,developed,considers,rates,percentage,set,determine,maximum,amount,which,will,consumed,start,activity,proposed,allows,scheduler,assign,each,can,during,procedure,When,information,inputted,automatically,changes,daily,shifts,along,their,available,total,times,expected,likelihood,demonstrated,constructing,network,its,histograms
AB值:
0.485684
相似文献
机标中图分类号,由域田数据科技根据网络公开资料自动分析生成,仅供学习研究参考。